PowderWatts - Measurement and Verification Plan

Last updated:

Executive Summary

This document outlines the measurement and verification (M\&V) methodology implemented to quantify energy savings resulting from heat cable monitoring systems installed by PowderWatts. The plan encompasses metering infrastructure, data collection protocols, and savings calculation methodologies.

Evidence of Asset

The following documentation is maintained to support verification:

  1. Hourly consumption data records

Methodology Selection

We will be using the Technical Specification: Quantifying energy use and emissions savings for seasonal controls which uses measured electricity consumption and computes a counterfactual based on maximum daily power consumption. This M&V plan calculates the savings for each device and aggregates them at the site level.

Data Requirements

Incorporated Data Requirements

The following are defined in the Technical Specification: Common Decarbonization methodology:

The following is a static description of the required and optional fields for a given Asset. An updated CSV template with the correct column names is available here and a time series description is available here. The daily aggregation data must be uploaded as a document with the columns aligning with the Daily Aggregated Data description below.

Attributional Data

The following data is required in addition to what is listed in Technical Specification: Common Decarbonization methodology.

Field Description Default if not provided Required? Use
Commenced Operation Date Date the intervention was completed   Y  
building_type Classification of building according to NREL ComStock/ResStock categories      
MAC Addresses A list of MAC addresses that align with the devices that are installed at the site      
Winter Season Months A list of calendar months when the heat cables would be in use during normal operation 11,12,1,2,3    
Shoulder Season Months A list calendar months when the heat cables may be in partial use during normal operations 4,5,6    

Monthly Aggregated Data

Field Description Default if not provided Required?
location_id Identifier for the location of the switch/device    
billing_month Billing month the summary applies to    
device_mac MAC address of the device    
device_name Human-readable name of the device    
device_type Type/category of the device    
on_hours Total hours the device was on during the month    
off_hours Total hours the device was off during the month    
total_saved_energy Energy saved by the device (all sockets combined)    
socket0_saved_energy Energy saved on socket 0    
socket1_saved_energy Energy saved on socket 1    
created_at Timestamp when the record was created    
kwh_used Total kilowatt-hours used during the billing month    
billing_location_id Linked billing identifier for the location    

Daily Aggregated Data

The inventory of the full scope of the intervention should be provided as a CSV that has one row per fixture location installed with the following columns:

Field Description Default if not provided Required?
mac Unique MAC address of the device    
report_date Date the daily summary is reported    
total_reporting_hours Total number of hours the device reported data    
total_time_on_hours Total hours the device was on    
total_time_off_hours Total hours the device was off    
watt_hours_used Total watt-hours of energy consumed    
socket0_occupied Whether socket 0 was occupied during the day    
socket0_90pct 90th percentile power use for socket 0    
socket1_occupied Whether socket 1 was occupied during the day    
socket1_90pct 90th percentile power use for socket 1    

Timeseries Data

The timeseries data should be provided with the following columns:

Field Description Required
device_id Unique identifier for the device (MAC address) Y
timeblock Timestamp of the measurement interval (hourly) Y
socket_0_occupied Whether socket 0 was occupied at that time Y
socket_0_watts Power draw (watts) on socket 0 Y
socket_1_occupied Whether socket 1 was occupied at that time Y
socket_1_watts Power draw (watts) on socket 1 Y
total_watts Total watts drawn across all sockets  

Verification Protocols

Data Validation

Ongoing verification procedures include:

This M\&V plan provides a robust framework for quantifying and verifying energy savings while maintaining conservative calculation approaches and comprehensive documentation standards.