SolarHoller - Measurement and Verification Plan

Last updated:

Executive Summary

This document outlines the measurement and verification (M\&V) methodology and data intake requirements for the PV projects managed by SolarHoller. The plan encompasses baseline establishment, metering infrastructure, data collection protocols, and savings calculation methodologies.

Evidence of Asset

Solar Holler will provide evidence that will demonstrate the installation of the measure. They will also need to include the solar panel inverter serial number on Asset upload.

Methodology Selection

We will use the Technical Specification: Common Decarbonization methodology.

We expect to use “Section 3(a): Calculating Hourly Emissions - When Hourly Consumption is Available.”

Data Requirements

Incorporated Data Requirements

The following are defined in the Technical Specification: Common Decarbonization methodology:

User-Provided Data Requirements

The following is a static description of the required and optional fields for a given Asset. An updated CSV template with the correct column names is available here and timeseries description is available here.

Attributional Data

The following data is required in addition to what is listed in Technical Specification: Common Decarbonization methodology.

Intervention

Field Description Default if not provided Required? Use
Nameplate Capacity (kW) The maximum rated power output of the system as specified by the manufacturer, measured in kilowatts (kW). - Y Auditing
Commenced Operation Date/Grid Connection Date The date when the system was officially connected to the grid. - Y Additionality?
Physical Meter Serial Number The unique identifier assigned to the physical electricity meter used for energy measurement. - - Provenance
Inverter Data Source The name of the inverter which is used for determining how to access production data. - - Provenance
Inverter Data ID A unique identifier for the purposes of acquiring production data from the inverter. - - Provenance
Estimated Annual Production (MWh) The projected amount of electricity the system is expected to generate annually, measured in megawatt-hours (MWh). - - Forecasting
EIA Plant ID A unique identification number assigned to the energy plant by the U.S. Energy Information Administration (EIA) for tracking and reporting purposes. - If Nameplate Capacity (kW) > 1000 -
External Registry Name Previous REC registry that this device was registered at. - - Double-Counting Protection
External Registry Device ID Unique identifier in previous REC register this device was registered at. - - Double-Counting Protection

Timeseries Data

The timeseries data should be provided with the following columns:

Field Description Required
start_datetime The datetime representing the start of the hourly meter read Y
energy_kwh The energy consumption that took place during the hour associated with this meter read Y

Data Management/Auditing Agreements

Timeseries Data

SolarHoller is collecting data through their supplier inverter account’s which give them access to individual customer’s meter data. They will either provide the data directly to WattCarbon or provide access to the data through their supplier’s API.

Audit Checks

The following audit checks will be performed: