Harvest Thermal - Measurement and Verification Plan

Last updated:

Executive Summary

This document outlines the measurement and verification (M&V) methodology and data intake requirements for the electrification projects managed by Harvest Thermal. The plan encompasses baseline establishment, metering infrastructure, data collection protocols, and savings calculation methodologies.

Evidence of Asset

Harvest Thermal will upload a photo of a receipt of each Asset that will include the line-item of the subsidy provided by this program. They will also need to include the heat pump serial number on Asset upload.

Methodology Selection

We will use the Technical Specification: Quantifying energy use and emissions savings for electrification methodology.

We expect to receive device-level reporting data (Baseline: 1.1.1, Reporting: 1.2.1), and a fixed prior-fuel efficiency factor to estimate the counterfactual data. We will assume that the UEF of the pre-intervention appliance(s) is 0.63, based on the DOE standard for high-flow water heaters. The space heating uses the same heating source as the water, so the same UEF is applied to both space and water heating. Fan use will be assumed to be the same in both the baseline and reporting periods.

Data Requirements

Incorporated Data Requirements

The following are defined in the Technical Specification: Common Decarbonization methodology:

User-Provided Data Requirements

The following is a static description of the required and optional fields for a given Asset. See the updated CSV template with the correct column names and timeseries description.

Attributional Data

The following data is required in addition to what is listed in Technical Specification: Common Decarbonization methodology.

General Building Characteristics

Field Description Default if not provided Required? Use
Square Footage of Living Space Total conditioned living area of the building in square feet - Y Modeling
Do walls have insulation? Indicates presence of wall insulation in the building Yes - Modeling
Alternative Fuel to Electrification Identifies the fuel type that would have been used if electrification was not implemented Natural Gas - Modeling
Building Type Classification of building according to NREL ResStock categories - Y Modeling
Year Built Year the building was originally constructed - Y Modeling
# of Stories Total number of above-ground floors in the building - Y Modeling
Likely Heating Thermostat Setpoint (°F) Expected temperature setting for heating system operation - - Modeling

Intervention

Field Description Default if not provided Required? Use
Commenced Operation Date Date when the electrification system installation was completed and began operation - Y Modeling
Physical Serial Number Serial number of the installed heat pump - Y Verification
Heating Backup System Description of any secondary or backup heating system installed - - Modeling
Furnace Replacement? Indicates if an electric furnace was installed to replace existing heating system - Y Modeling
Water Heater Replacement? Indicates if an electric water heater was installed to replace existing unit - Y Modeling
Oven Replacement? Indicates if an electric oven was installed to replace existing appliance - Y Modeling
Dryer Replacement? Indicates if an electric clothes dryer was installed to replace existing appliance - Y Modeling
Pool Heater Replacement? Indicates if an electric pool heater was installed to replace existing system - Y Modeling
Additional EE Work Done During Install? Identifies any energy efficiency improvements made during electrification (None, Basic, Enhanced) None - Modeling
Effective Useful Life (Years) Expected operational lifespan of installed electrification equipment 15 - EAC Attribution
Rated for Cold Climates? Indicates if the installed equipment is rated for operation in cold climate conditions No - EAC Attribution

Timeseries Data

Field Description Required
datetime The date and time representing the end of the interval Y
DF1 Flow rate of water into tank / domestic hot water pre-mix Y
DF2 Flow rate of water through hydronic coil Y
DF3 Flow rate of water from HPWH Y
T1 Temperature of hot water to hydronic coil and domestic hot water pre-mixing valve Y
T2 Temperature of utility cold water into tank Y
T3 Temperature of water returned from hydronic coil Y
T4 Tank temperature sensor Y
T5 Temperature of water returned to HPWH Y
T6 Temperature of water supplied from HPWH Y
T10 Temperature of post-mixing valve domestic hot water Y
T_RAT Temperature of Return Air to the Air Handler = Indoor Ambient Air Temperature when the fan is running and the ventilator is not Y
P1 Heat pump power Y
P2 Fan power Y
D_In_Wire_G Thermostat call for fan Y
D_In_Wire_W1 Thermostat call for heat stage 1 Y
D_In_Wire_W2 Thermostat call for heat stage 2 Y

Data Management/Auditing Agreements

Harvest Thermal will supply the device telemetry data used in this analysis. The data will be made available through an API endpoint and fetched on a nightly basis. Savings calculations will be rerun nightly to generate EACs.