Elephant Energy - Measurement and Verification Plan
Last updated:
Executive Summary
This document outlines the measurement and verification (M&V) methodology and data intake requirements for the electrification projects managed by Elephant Energy. The plan encompasses baseline establishment, metering infrastructure, data collection protocols, and savings calculation methodologies.
Evidence of Asset
Elephant Energy will upload a photo of a receipt of each Asset that will include the line-item of the subsidy provided by this program. They will also need to include the heat pump serial number on Asset upload.
Methodology Selection
We will use the Technical Specification: Quantifying energy use and emissions savings for electrification methodology.
We expect to receive 12 pre-intervention bills representing approximately 12 months of data that will be provided upon Asset upload. We expect to use “From NREL Building Selection, if no reporting data is available (Baseline: 1.1.2.2 and Reporting: 1.2.3). Approximately 1-year post-intervention, WattCarbon will receive 12 post-intervention bills representing approximately 12 months of data. After receiving and auditing this data, if it passes data sufficiency requirements, the Asset will switch to “From EEMeter Model, if reporting data is available (Baseline: 1.1.2.1 and Reporting: 1.2.2.1).
Data Requirements
Incorporated Data Requirements
The following are defined in the Technical Specification: Common Decarbonization methodology:
- Definitions
- Electricity Carbon Intensity Calculations
- Shared Data Intake Requirements
- Consequential Carbon Accounting Rules
- EAC Definition and Rules
- Generated Versus Avoided Emissions
User-Provided Data Requirements
The following is a static description of the required and optional fields for a given Asset. An updated CSV template with the correct column names is available here and timeseries description is available here.
Attributional Data
The following data is required in addition to what is listed in Technical Specification: Common Decarbonization methodology.
General Building Characteristics
Field | Description | Default if not provided | Required? | Use |
---|---|---|---|---|
Square Footage of Living Space | Total conditioned living area of the building in square feet | - | Y | Modeling |
Do walls have insulation? | Indicates presence of wall insulation in the building | Yes | - | Modeling |
Alternative Fuel to Electrification | Identifies the fuel type that would have been used if electrification was not implemented | Natural Gas | - | Modeling |
Building Type | Classification of building according to NREL ResStock categories | - | Y | Modeling |
Year Built | Year the building was originally constructed | - | Y | Modeling |
# of Stories | Total number of above-ground floors in the building | - | Y | Modeling |
Likely Heating Thermostat Setpoint (°F) | Expected temperature setting for heating system operation | - | - | Modeling |
Intervention
Field | Description | Default if not provided | Required? | Use |
---|---|---|---|---|
Commenced Operation Date | Date when the electrification system installation was completed and began operation | - | Y | Modeling |
Physical Serial Number | Serial number of the installed heat pump | - | Y | Verification |
Heating Backup System | Description of any secondary or backup heating system installed | - | - | Modeling |
Furnace Replacement? | Indicates if an electric furnace was installed to replace existing heating system | - | Y | Modeling |
Water Heater Replacement? | Indicates if an electric water heater was installed to replace existing unit | - | Y | Modeling |
Oven Replacement? | Indicates if an electric oven was installed to replace existing appliance | - | Y | Modeling |
Dryer Replacement? | Indicates if an electric clothes dryer was installed to replace existing appliance | - | Y | Modeling |
Pool Heater Replacement? | Indicates if an electric pool heater was installed to replace existing system | - | Y | Modeling |
Additional EE Work Done During Install? | Identifies any energy efficiency improvements made during electrification (None, Basic, Enhanced) | None | - | Modeling |
Effective Useful Life (Years) | Expected operational lifespan of installed electrification equipment | 15 | - | EAC Attribution |
Rated for Cold Climates? | Indicates if the installed equipment is rated for operation in cold climate conditions | No | - | EAC Attribution |
Timeseries Data
The timeseries data should be provided with the following columns:
Field | Description | Required |
---|---|---|
start_date | The date representing the start of the bill cycle | Y |
end_date | The date representing the end of the bill cycle | Y |
energy_kwh | The energy consumption that took place during that bill cycle. | Y |
Data Management/Auditing Agreements
Timeseries Data
Elephant Energy is partnering with Bayou Energy, who will supply the electricity and gas bills used in this analysis. At around the time of the intervention, Bayou will provide the most recent 12 bills leading up to the intervention. These bills will be used to establish the baseline consumption of the building. One year following the intervention, Bayou will provide 12 post-intervention bills. These 12 bills should be after the intervention, starting with the second bill after the intervention.
For example, if an intervention took place on June 5, 2022, and the following bills existed for that home, we would take the bills 2021-06-18 through 2022-05-18 to represent the baseline consumption, we would exclude the bill 2022-06-10 as it is partially in both the pre -and post-intervention periods, and we would take the bills 2022-07-12 through 2023-06-13 to represent reporting consumption.
Bill # | Baseline | Reporting |
---|---|---|
1 | 2021-06-18 | 2022-07-12 |
2 | 2021-07-09 | 2022-08-11 |
3 | 2021-08-10 | 2022-09-15 |
4 | 2021-09-18 | 2022-10-18 |
5 | 2021-10-15 | 2022-11-11 |
6 | 2021-11-09 | 2022-12-08 |
7 | 2021-12-12 | 2023-01-08 |
8 | 2022-01-08 | 2023-02-11 |
9 | 2022-02-14 | 2023-03-14 |
10 | 2022-03-20 | 2023-04-15 |
11 | 2022-04-22 | 2023-05-11 |
12 | 2022-05-18 | 2023-06-13 |