BlocPower - Measurement and Verification Plan

This document outlines the measurement and verification (M&V) methodology and data intake requirements for the electrification projects managed by BlocPower. The plan encompasses baseline establishment, metering infrastructure, data collection protocols, and savings calculation methodologies.

BlocPower will provide evidence that will demonstrate the installation of the measure. They will also need to include the heat pump serial number on Asset upload.

We will use the Building-Level Weather Normalization methodology.

We expect to use “From NREL ResStock SqFt-Based Load Selection (Baseline: 1.1.3.2 and Reporting: 1.2.5.2).

The following are defined in the Shared Guidelines methodology:

  • Definitions
  • Electricity Carbon Intensity Calculations
  • Shared Data Intake Requirements
  • Consequential Carbon Accounting Rules
  • EAC Definition and Rules
  • Generated Versus Avoided Emissions

The following is a static description of the required and optional fields for a given Asset. An updated CSV template with the correct column names is available here and timeseries description is available here.

The following data is required in addition to what is listed in Shared Guidelines methodology.

FieldDescriptionDefault if not providedRequired?Use
Square Footage of Living SpaceTotal conditioned living area of the building in square feet-YModeling
Do walls have insulation?Indicates presence of wall insulation in the buildingYes-Modeling
Alternative Fuel to ElectrificationIdentifies the fuel type that would have been used if electrification was not implementedNatural Gas-Modeling
Building TypeClassification of building according to NREL ResStock categories-YModeling
Year BuiltYear the building was originally constructed-YModeling
# of StoriesTotal number of above-ground floors in the building-YModeling
Likely Heating Thermostat Setpoint (°F)Expected temperature setting for heating system operation--Modeling
FieldDescriptionDefault if not providedRequired?Use
Commenced Operation DateDate when the electrification system installation was completed and began operation-YModeling
Physical Serial NumberSerial number of the installed heat pump-YVerification
Heating Backup SystemDescription of any secondary or backup heating system installed--Modeling
Furnace Replacement?Indicates if an electric furnace was installed to replace existing heating system-YModeling
Water Heater Replacement?Indicates if an electric water heater was installed to replace existing unit-YModeling
Oven Replacement?Indicates if an electric oven was installed to replace existing appliance-YModeling
Dryer Replacement?Indicates if an electric clothes dryer was installed to replace existing appliance-YModeling
Pool Heater Replacement?Indicates if an electric pool heater was installed to replace existing system-YModeling
Additional EE Work Done During Install?Identifies any energy efficiency improvements made during electrification (None, Basic, Enhanced)None-Modeling
Effective Useful Life (Years)Expected operational lifespan of installed electrification equipment15-EAC Attribution
Rated for Cold Climates?Indicates if the installed equipment is rated for operation in cold climate conditionsNo-EAC Attribution