Skip to content

Harvest Thermal - Measurement and Verification Plan

This document outlines the measurement and verification (M&V) methodology and data intake requirements for the electrification projects managed by Harvest Thermal. The plan encompasses baseline establishment, metering infrastructure, data collection protocols, and savings calculation methodologies.

Harvest Thermal will upload a photo of a receipt of each Asset that will include the line-item of the subsidy provided by this program. They will also need to include the heat pump serial number on Asset upload.

We will use the Device-Level Sensors for Electrification methodology.

We expect to receive device-level reporting data (Baseline: 1.1.1, Reporting: 1.2.1), and a fixed prior-fuel efficiency factor to estimate the counterfactual data. We will assume that the UEF of the pre-intervention appliance(s) is 0.63, based on the DOE standard for high-flow water heaters. The space heating uses the same heating source as the water, so the same UEF is applied to both space and water heating. Fan use will be assumed to be the same in both the baseline and reporting periods.

The following are defined in the Shared Guidelines methodology:

  • Definitions
  • Electricity Carbon Intensity Calculations
  • Shared Data Intake Requirements
  • Consequential Carbon Accounting Rules
  • EAC Definition and Rules
  • Generated Versus Avoided Emissions

The following is a static description of the required and optional fields for a given Asset. See the updated CSV template with the correct column names and timeseries description.

The following data is required in addition to what is listed in Shared Guidelines methodology.

FieldDescriptionDefault if not providedRequired?Use
Square Footage of Living SpaceTotal conditioned living area of the building in square feet-YModeling
Do walls have insulation?Indicates presence of wall insulation in the buildingYes-Modeling
Alternative Fuel to ElectrificationIdentifies the fuel type that would have been used if electrification was not implementedNatural Gas-Modeling
Building TypeClassification of building according to NREL ResStock categories-YModeling
Year BuiltYear the building was originally constructed-YModeling
# of StoriesTotal number of above-ground floors in the building-YModeling
Likely Heating Thermostat Setpoint (°F)Expected temperature setting for heating system operation--Modeling
FieldDescriptionDefault if not providedRequired?Use
Commenced Operation DateDate when the electrification system installation was completed and began operation-YModeling
Physical Serial NumberSerial number of the installed heat pump-YVerification
Heating Backup SystemDescription of any secondary or backup heating system installed--Modeling
Furnace Replacement?Indicates if an electric furnace was installed to replace existing heating system-YModeling
Water Heater Replacement?Indicates if an electric water heater was installed to replace existing unit-YModeling
Oven Replacement?Indicates if an electric oven was installed to replace existing appliance-YModeling
Dryer Replacement?Indicates if an electric clothes dryer was installed to replace existing appliance-YModeling
Pool Heater Replacement?Indicates if an electric pool heater was installed to replace existing system-YModeling
Additional EE Work Done During Install?Identifies any energy efficiency improvements made during electrification (None, Basic, Enhanced)None-Modeling
Effective Useful Life (Years)Expected operational lifespan of installed electrification equipment15-EAC Attribution
Rated for Cold Climates?Indicates if the installed equipment is rated for operation in cold climate conditionsNo-EAC Attribution
FieldDescriptionRequired
datetimeThe date and time representing the end of the intervalY
DF1Flow rate of water into tank / domestic hot water pre-mixY
DF2Flow rate of water through hydronic coilY
DF3Flow rate of water from HPWHY
T1Temperature of hot water to hydronic coil and domestic hot water pre-mixing valveY
T2Temperature of utility cold water into tankY
T3Temperature of water returned from hydronic coilY
T4Tank temperature sensorY
T5Temperature of water returned to HPWHY
T6Temperature of water supplied from HPWHY
T10Temperature of post-mixing valve domestic hot waterY
T_RATTemperature of Return Air to the Air Handler = Indoor Ambient Air Temperature when the fan is running and the ventilator is notY
P1Heat pump powerY
P2Fan powerY
D_In_Wire_GThermostat call for fanY
D_In_Wire_W1Thermostat call for heat stage 1Y
D_In_Wire_W2Thermostat call for heat stage 2Y

Harvest Thermal will supply the device telemetry data used in this analysis. The data will be made available through an API endpoint and fetched on a nightly basis. Savings calculations will be rerun nightly to generate EACs.